Tolent Construction, Long Lane

We were contracted by Tolent Construction to provide a steel framing system (£400k) and drywall/painting package (£1.9m) to The Taper Building, Long Lane, Southwark. The development will provide 1,2 & 3 bedroom residential apartments with an on-site gymnasium, residents' garden and 12h-concierge. We have a great working relationship with Tolent Construction and have worked with them on many projects throughout London and the South East.

Works undertaken: Steel Framing System, Drywall and Painting

Contract Length: 15 months

Return to Case Studies